Breaking News
U.S. Navy Plan Proposes 15 New Nuclear-Powered Battleships at $18.3 B Each to Replace DDG(X).
A new U.S. Navy shipbuilding plan proposes building 15 nuclear-powered battleships at an estimated average cost of $18.3 billion per ship, according to the Congressional Budget Office (CBO). The sweeping fleet restructuring shifts surface combatant construction toward additional Arleigh Burke-class destroyers alongside a smaller force of heavily armed nuclear capital ships replacing the planned DDG(X) destroyer program.

An AI-generated editorial illustration depicts the proposed USS Defiant, the lead ship of the U.S. Navy’s planned Trump-class guided-missile battleships. The ship’s appearance is interpretive. (AI Generated image)
In its November 19, 2026, analysis of the U.S. Navy’s fiscal 2027 shipbuilding plan, CBO (Congressional Budget Office) put the construction cost of the 15 Trump-class battleships at about $275 billion in 2026 dollars. The U.S. Navy’s plan schedules the first purchase for fiscal 2028 and roughly one every other year through fiscal 2056. The November review carries forward the cost estimate the CBO published in August and puts it alongside the Navy’s other shipbuilding commitments.
The CBO estimates that the lead ship would cost $23.4 billion and that the following 14 would average about $18 billion apiece. The U.S. Navy’s published estimate puts the lead ship at $15.1 billion and subsequent ships at an average of $9.7 billion. The U.S. Navy figures exclude nuclear propulsion, which the service chose late in the planning process, and CBO says the Navy had yet to update them. The $275 billion construction estimate excludes research and development.
Related Topic: U.S. Congress approves deployment of SLCM-N nuclear cruise missiles on Trump-class battleships
The new U.S. Navy battleship would displace at least 35,000 long tons, more than three times the displacement of a Flight III Arleigh Burke-class guided-missile destroyer. The U.S. Navy’s fiscal 2025 plan called for 23 Flight III destroyers and 28 next-generation DDG(X) destroyers. The fiscal 2027 plan drops the DDG(X) purchases, increases the number of Flight III destroyers to 57, and adds 15 battleships. CBO estimates that the Flight III ships would average $3.2 billion apiece under the new plan.
The most direct measure of the proposed battleship’s combat capability is its missile magazine. CBO describes a design with 128 Mark 41 vertical launch cells, compared with 96 on a Flight III Arleigh Burke destroyer and 122 on a Ticonderoga-class cruiser. The battleship would have one-third more standard cells than a Flight III destroyer and six more than a Ticonderoga. Those cells could hold a mix of air-defense, anti-ship, and land-attack missiles. The mix assigned for a deployment would determine how much of that capacity was available for each mission.
The design also calls for four separate launch tubes that could carry a total of 12 Conventional Prompt Strike hypersonic missiles. That matches the planned capacity of a Zumwalt-class destroyer undergoing conversion for the same weapon. A Zumwalt has 80 standard vertical launch cells, so the proposed battleship would combine the same planned hypersonic missile capacity with 48 more standard cells.
The proposed fit also includes two high-powered lasers, an electromagnetic railgun and a larger version of the U.S. Navy’s AN/SPY-6 air and missile defense radar. CBO says the Navy could reserve space and electrical power for later installation if some technologies are unavailable when construction begins. Nuclear propulsion would eliminate routine refueling for the ship’s propulsion plant, while food, ammunition and other supplies would still shape its endurance at sea.
That mix would expand planned purchases of large surface combatants from 51 to 72, while assigning a large share of the fleet’s missile capacity to a relatively small number of hulls. CBO flagged a tension with the U.S. Navy’s broader goal of spreading firepower across more ships and unmanned vessels. The battleships would concentrate firepower within that program, while the wider fleet plan would distribute it across more vessels over time.
The procurement schedule also depends on shipyard capacity. CBO identifies Newport News Shipbuilding as the only U.S. yard currently certified to build nuclear-powered surface ships. Other yards could build sections and modules, but final assembly would take place at the Virginia yard, where aircraft carrier and submarine work is already behind schedule. CBO warns that adding the battleships could lengthen delays on those programs and on the battleships themselves.
Explore More Defense News
• Land Defense News
• Naval Defense News
• Defense Aerospace News
Written by Alain Servaes – Chief Editor, Army Recognition Group
Alain Servaes is a former infantry non-commissioned officer and the founder of Army Recognition. With over 20 years in defense journalism, he provides expert analysis on military equipment, NATO operations, and the global defense industry.















