Light Tactical Vehicles.
Ground Mobility Vehicle GMV 1.1.
|
Ground Mobility Vehicle GMV 1.1 for Special Forces
|
|||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||
![]() |
|||||||||||||||||||||||||||||||||||
| The Ground Mobility Vehicle 1.1 is a high-mobility all-terrain Special Forces Vehicle designed and manufactured by the American Company General Dynamics. The vehicle was originally manufactured by the Company Force protection under the name of Jamma (Joint All-Terrain Modular Mobility Asset). In November 2011, Force Protection was bought by General Dynamics. The Jamma was presented for the first time at the Association of the United States Army (AUSA) Institute of Land Warfare's Winter Symposium in Ft. Lauderdale in February 2010. A new version of the Jamma was unveiled by Force Protection at IDEX 2011 defense Exhibition in Abu Dhabi, United Arab Emirates. The JAMMA vehicle has been designed from the ground up to be the new standard in light tactical vehicles and its light weight, high strength structure provides a wealth of multi-role mission configurations for its end-users. The vehicle was developed to fit the unique dimensions of the and offer the Special Operations user an armor ready, four occupant, hybrid powered, high performance off road vehicle, capable of being internally transported inside that aircraft. In August 2013, General Dynamics Ordnance and Tactical Systems of St. Petersburg, Fla., is being awarded an indefinite-delivery/indefinite-quantity contract with firm-fixed-price, cost-plus-fixed-fee and cost delivery orders (or any combination of those) contract with total ceiling of $562,210,980 for the purchase of Ground Mobility Vehicles 1.1 (GMV 1.1). The GMV 1.1 is internally transportable in the CH-47 Chinook and also in V-22 Osprey aircraft. Because of its unique modularity, the GMV 1.1 can easily be expanded to maximize the cargo space of the larger CH-47. |
|||||||||||||||||||||||||||||||||||
| Variants | |||||||||||||||||||||||||||||||||||
|
- No variants at this time.
|
|||||||||||||||||||||||||||||||||||
| Technical Data | |||||||||||||||||||||||||||||||||||
| Back to top | |||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||
| Back to top | |||||||||||||||||||||||||||||||||||






























