Lockheed Martin

 

IDEX 2011 International Defence Exhibition Conference Exhibition news daily Abu Dhabi  United Arab Emirates Exhibitors visitors information pictures description Salon international défense conférence pictures photos images actualités journal official en ligne internet Emirats Arabes Unis

IDEX 2011
International Defence Exhibition & Conference
Abu Dhabi
, United Arab Emirates
20 - 24 February 2011
 
New mobility track demonstration at IDEX 2011
 
 

Sunday, 02 January 2011, 17:30 PM

 
IDEX 2011 the new mobility track demonstration with 14 obstacles.
 
 
As for each edition of the international defence exhibition IDEX, the organizers of the fair make it possible to all exhibitors to present their vehicles and equipment on the mobility track demonstration.
     
As for each edition of the international defence exhibition IDEX, the organizers of the fair make it possible to all exhibitors to present their vehicles and equipment on the mobility track demonstration.
Dynamic track demonstration area IDEX 2009
     

For this edition 2011 of IDEX, which is also the 10° anniversary of the event, the mobility track demonstration area was improved with 7 new obstacles. In exclusiveness on the site Army Recognition, the new mobility track demonstration of IDEX 2011, with the detail of all the obstacles.

     
For this edition 2011 of IDEX, which is also the 10° anniversary of the event, the mobility track demonstration area was improved with 7 new obstacles. In exclusiveness on the site Army Recognition, the new mobility track demonstration of IDEX 2011, with the detail of all the obstacles.
     
1. Roling Hills (Same IDEX 2009)

L: 12 - W: 7 - H: 0.6 CD: 0.6
     
2. K-Water (NEW)

L: 50 - W: 8 - H: 1,2 (Water Depth) - 54 (L) Critical Dimension
     
3. Sideslope 25 deg (NEW)

L:20 - W: 5.5 - H: 2.0 - 25deg (Critical Dimension)
     
4. Rough Concrete Road (NEW)

L:20 - W: 8 - H: 0.25 - CD:0.25 (H)
     
5. Log Roll (NEW)

L: 7 - W: 4.5 - H: 0.6 - CD: 0.6 (H)
     
6. Ditch (NEW)

L: 10-20 - W: 10-5.5 - H: 0.2 (Depth) - CD: 0.2 (H)
     
7. J-Ramp (Same IDEX 2009)

L: 9 - W: 5.5 - H: 0.8 (Ramp) - CD: 0.8 (H)
     
8. H-Ramp / Broken Bridge (Same IDEX 2009)

L: 20-30 - W: 5.5 - H: 1.35 (Ramp) - CD: 1.8 (Gap)
     
9. E-Water (Same IDEX 2009)

L: 45 - W: 8 - H: 1.8 (Water Depth) - CD: 2.0 (H)
     
10. Low Hill (NEW)

L: 50 - W: 5 - H: 2.7 - CD: 5 (W)
     
11. Snake Climb (NEW)

L: 25 - W: 4 - H: 0-2.7 - CD: 2.7 (H)
     
12. Stairs (NEW)

W: 6 - L: 3.5 - H: 2.5 - CD: 0.15 (Step height)
     
13. Vertical Step (NEW)

W: 5 - L: 0.5 - H: 0.8 (Step Height) - CD: 0.8 (H)
     
14. Concrete Pile (NEW)

L:7 - W: 4-5 H: 0.6 - CD: 5(W)
 
< Prev   Next >
SEO by Artio
 
--------------------------- FLASH NEWS ---------------------------
Internet defence and security magazine Army Recognition is Official media partner and the Official Online Show Daily News for Eurosatory 2012, International Defence & Security Exhibition in Paris, France . More news, pictures, videoOnline defence and security magazine Army Recognition is Official media partner and the Official Online Show Daily News for Eurosatory 2012, International Defence & Security Exhibition in Paris, France . News, pictures, video ...
 
Acmat Defene VLRA TDN-TDE  Commando ALTV Bastion  APC Patsas  Special Forces Operations vehicle

Advertising Video on Army Recognition Click Here

Lockheed Martin



Rafael Israel Israeli defence industry military technology equipment



Subscribe NewsLetter