- Posted On
WFEL is showcasing its DSB Dry Support Bridge, the world’s most technically advanced, rapidly deployable military bridge of its type; a 46m bridge can be constructed by a crew of 8 in under 90 minutes. With its Military Load Classification (MLC) of 120, this bridging system allows the heaviest of military vehicles to cross both wet and dry gaps.